|
Administrative Services Building, 1970. (Kerr Administration Building) This six-floor tower was the 15th OSU building constructed by the lift-slab method, in which all floors were completed at ground level and later raised into place. OSU officials appreciated the method's ""flexibility for later changes"". The building still includes 2 lift-slab floors on top for eventual expansion to 8 floors.
|
|
|
|
|
|
|